KS Engineers, P.C. (KSE) was retained to provide the preliminary design of the superstructure for the new Terminal 6 at John F. Kennedy International Airport, for the Port Authority of New York & New Jersey. KSE’s scope of work was to prepare calculations for a three-span, continuous steel girder bridge as part of the Terminal 6 Viaduct Departure Ramp, DR-2. The steel girders framed into integral steel pier caps to maximize the roadway clearance beneath the bridge
#2239




